49th month (July 2008)

This month Peter...

July 2008
We filled the gaps...

July 2008 to stop any exhaust fumes from coming in the back.
July 2008 It is ready for the fibreglass panel. July 2008 and here it is.
July 2008 Peter cleaned the inside July 2008 It was quiet messy.
July 2008 The panel is bogged and painted. July 2008 The rear door frame has a test fit.
July 2008 Side engine door frame. July 2008 What it used to look like.
July 2008
Frames for the passenger bin.

July 2008 and the hole for the passenger bin. (Near the front)
July 2008 The open area. July 2008 With the frame being test fitted.

50th month (August 2008)

This month Peter... perhaps finish hanging the driver side bin doors and finish the passenger side bin doors.

52st month (September 2008)

This month Peter... perhaps will install the rear and side lights. Maybe even work on the dash.???